CONTACT

CONTACT:Mr. Xu

+86-13771502818
+86-18762620800
E-mial:[email protected] Address:Siqian Village, Nanhu Community, Binhu District, Wuxi City

Vacuum diffusion pump operating procedures

1. Check all parts of the vacuum system, familiarize yourself with the gas path structure of the system, understand the functions of the various components of the vacuum system, and the circuit connections of the operating parts.

2. Close the deflation valve, start the mechanical pump, pump the system, and use the spark leak detector to check all parts of the system. In the case of an all-metal system, the valve can be closed and the P-t curve recorded as a vacuum gauge reading (for a static boost test). If the pressure rises linearly with time, it can be concluded that the system has a leak source and should be leak tested.

3. When the system vacuum reaches the pre-pressure of the oil diffusion pump (5×10-2 Torr), start the diffusion pump to gradually increase the heating current to the rated value. Cool water should be turned on before starting the diffusion pump.

4. After the diffusion pump is working normally, use a spark leak detector (or thermocouple meter) to judge the vacuum of the measurement system. An ionization gauge can be used up to 10-3 Torr (a thermocouple is nearly full or 95 squares or more). When using, first degas the regulation, then measure the degree of vacuum.

5. Bake and degas the system. For the glass system, the hard glass baking temperature is 400 ° C ~ 450 ° C, and the soft glass is 350 ° C ~ 400 ° C. Degassing time depends on specific requirements, usually 1 to 2 hours. After the degassing, the vacuum is still not up to the requirement, and the P-t curve should be recorded using the ionization meter to determine whether it is leaking. You can also use the acetone, alcohol, etc. to smear the suspicious place, see the swing of the hands to find the leak. If it is bad for degassing, it should be further baked and degased for a long time. The new system generally takes a long time to reach the desired vacuum. If the vacuum is too old, consider whether the system design, installation is reasonable, whether there is dead space, whether the gas source is more or not, whether the dirt is brought in during maintenance, whether the container is cleaned, and other factors.
2019/05/11 13:52:10 4370 次

Related Documents

Copy right ? 2019 Wuxi Guode Machinery Manufacturing Co., Ltd. Record number: Su ICP No. 19021329
国产91av视频在线观看| 99综合色| 情爱小说高潮版| 欧美色诱惑| 尤物福利视频| av电影片| 清纯校花的堕落| 欧美寡妇xxxx黑人猛交| 三个熟睡少妇的按摩中文字幕| 3d蒂法被av免费观看| 欧美在线观看视频一区| 断片之险途夺宝在线完整免费观看| 法国xxx性hd在线播放| 新的少妇metart裸体| 国产精品丝袜白浆摸在线| 日韩在线精品强乱中文字幕| 和男神们啪啪日常np高| 午夜夜夜躁精品福利网| 长腿校花呻呤迎合娇躯白嫩小视频| 免费在线观看不卡av| 女同志大乳吸允| 韩国少妇xxxx做受| 美丽的姑娘完整版高清在线播放| 国产a∨精品一区二区三区不卡| 男男h捆绑调教sm| 可以免费观看av的网站| 日本高清一区| 奴性豪门少爷后宫| h嗯啊灌满了师尊| 少妇按摩做爰完整版| 3dxxxx videos cartoon无尽| 91麻豆下载| 欧美三级一区二区| 中文字幕欧美一区二区三区| 扒开屁股眼浣肠调教小说| 中文字幕无线精品亚洲乱码一区| 快穿之被各种男人啪h| 顶级欧美贵妇高清xxxxx| 亚洲精品高清在线| 变态催眠调教变浪荡合集男男| 99精品国产一区二区三区|